GREEN HUT HOTEL PROJECT – KOLKATA

Project Info

  • Construction Date

    2016 – In Progress

  • Category

    1

Design and Construction work of Diaphragm Wall and Structure up to +900 level including pile cap columns, two nos of Basement slabs and Ground Floor at IB-167, Sector – III, Salt Lake City, Kolkata including all R.C.C. work, brickwork, Structural Steel work, Plastering, Roofing and Water Proofing.