Design, Fabrication, Erection and Commissioning of Container Handling Crane for TEE HEAD JETTY at Falta Export Processing Zone.…
Design, Fabrication, Erection and Commissioning of Container Handling Crane for TEE HEAD JETTY at Falta Export Processing Zone.…
Soil Stabilization by installation of stone columns & construction of sand pad foundation for vertical tanks at Budge Budge Terminal. Kolkata.…
1. Construction of RCC Bored Piles (600mm Dia).
2. Supply fabrication & Installation of a Steel Foot Bridge of 30 metre span.
3. Installation of M.S Floating Pontoon and Yoke Assembly and M.S Sloping Gangway
4. Construction of Infrastructure Facilities including Passenger’s Rest shed,Booking counter,Toilet,Telephone booth with electrical Installations.…
Design and Installation of sixth Heavy Duty 6 k.V. H.T. Pump Motor Set with suction and delivery Pipeline and allied works at Raw Water Pumping Station, Phase – II, at Garden Reach Water Works (GRWW).…
Supplying, Fitting and fixing of M.S. Stop Log Gates including making necessary Hoisting and storing arrangement at the R/S of Chitpur Lock Gate over circular Canal.
…
Execution of remaining works for the Design, Supply, Construction & Commissioning of Raw Sewage Pumping Station at Phanihati Zone – I & II under Ganga Action Plan. …
Construction of Diaphragm Wall, Apron Slab for Quay slopping hard, Dredging/Disposal for Fishing Harbour at Pondicherry.…
Protective Measure for Pier No.2 ( Kolkata side ) of Vidyasagar Setu and Bank Protection of its vicinity. …