UTTARPARA KOTRUNG MUNICIPALITY

DESIGN, CONSTRUCTION OF A COMPLETELY SCADA BASED AUTOMATED, ENERGY EFFICIENT WATER TREATMENT PLANT HAVING FINAL OUTPUT/PRODUCTION CAPACITY OF 10.84 MLD IN 20 HOURS PLANT OPERATION DURATION/PERIOD PER DAY ON TURNKEY BASIS FOR UTTARPARA-KORTRUNG MUNICIPALITY.

16

PANIHATI RAW SEWAGE PUMPING STATION

Execution of remaining works for the Design, Supply, Construction & Commissioning of Raw Sewage Pumping Station at Phanihati Zone – I & II under Ganga Action Plan.

IMG_2083

GRWW PUMP HOUSE

Design and Construction of Clear Water Pump House including connection with the existing Clear Water Reservoir for 1200 CuM per hour capacity, Garden Reach Water Treatment Plant (Phase – II), Bidhannagar, Kolkata.

Image1069

DUNLOP JACK PUSHING

Laying of 1200 mm dia (I.D) M.S. Water Main under B.T. Road near Dunlop crossing starting from Baranagar Police Housing campus at Western Flank upto Bagjola Canal at Eastern Flank including construction of Trestle Bridge over Canal in connection with Transmunicipal Water Supply Scheme for Dum, Dum, North & South DumDum Municipality under JNNURM.

final

TRESTLE BRIDGE & WATER MAIN

Laying of 1200 mm dia (I.D.) M.S. Water main under B.T. Road near Dunlop crossing starting from Baranagar Police Housing Campus t western flank up to Bagjola Canal at eastern flank including Construction of Trestle bRidge over Canal in connection with Transmunicipal Water Supply Scheme for Dum Dum & South Dum Dum Municipality under JnNURM.

upload

PANIHATI UGR CUM PUMP HOUSE

Design & Construction of One (1) No. UGR-cum-Pump House of 2.0 (Two) M.G. capacity over pile foundation at Panihati Municipality on Turnkey Basis

10

SENPALLY SEMI-UGR & BOOSTER PUMPING STATION

Design and Construction of 3.0 MG Capacity Semi Underground Reservoir – cum – Booster Pumping Station (SUGR-cum-BPS) at Senpally, Behala, Ward No. 129.

no-image01

MS WATER MAIN – TRENCH LESS LAYING

Diversion and re-laying of 300 mm dia M.S. water main at the junction of Goragacha Road and Diamond Harbour Road with the help of Trench less technology by machine to facilitate construction of Taratala Fly over.

no-image01

SEWAGE TREATMENT PLANT

Construction of Low Cost Sewage Treatment Plant (STP-II, Western Part) with R.C.C. retaining wall including ancillary works at Mangal Pandey Udyan in Barrackpur Town.