KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY

Design, supply, installation, construction, commissioning & testing of 140 MLD capacity Jetty-mounted Raw Water Pump House & sub-station with bank protection work near Bhut Ghat (Within College Reach) and laying of 1600 mm diameter MS raw water pumping main from RWPS upto 400 Mtr Battery limit  including installation of valves, flow meters etc. all complete, along with 3 months’ trial run and complete operation & maintenance for 60 months for Rajpur-Sonarpur Municipality under AMRUT on Turnkey basis.

KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY

Design, supply, installation, construction, commissioning & testing of 40 MGD capacity Jetty-mounted Raw Water Pump House & sub-station with bank protection work and laying of 1400 mm diameter MS raw water pumping main from RWPS to WTP including installation of valves, flowmeters etc. all complete, along with 3 months’ trial run and complete operation & maintenance for 60 months at Uludanga, Maheshtala Municipality and Design, supply, installation, construction, commissioning & testing of 40 MGD capacity Water Treatment Plant with space saving technology including 5.0 M.G. capacity Underground Reservoir cum Pumping Station & outlet pipes up to battery limit with sub-station buildings, internal roads, drainage, illumination etc. all complete along with 3 months’ trial run and complete operation & maintenance for 60 months within Akra, Mahestala Municipality on turnkey basis…

PUJALI RAW WATER INTAKE JETTY

Design, Drawing, Construction and commissioning of R.C.C Intake Jetty with pump House mounted on the Jetty along with Sub-station Building (incorporated in jetty complex) all civil and Electromechanicl works complete, by the side of river Ganga under pujali Municipality and lying of 400mm diameter M.S.Raw water Rising Main from Raw water Intake Jetty to Pujali water Treatment plant and operation and maintenance for a period of 12 months after commissioning of the project under Pujali Municipality on trunkey basis

KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY

“Design, Construction and Commissioning of R.C.C. Intake Jetty with Pump House mounted on the Jetty Head along with Sub-Station Building all Civil and Electro-Mechanical works complete, in the location of the existing Intake Jetty of Srirampore Municipality by side of River Ganga and supplying and laying of 500 mm dia M.S. raw water rising main from Raw Water Intake Jetty upto 3 mtr. from the Inlet Well of the proposed W.T.P. with trial run for 3 months and Operation and Maintenance for a period of 12 months after commissioning of the Project on turnkey basis within Srirampore Municipal Area under AMRUT.(2nd Call).

KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY

DETAILED DESIGN, DRAWING, CONSTRUCTION AND COMMISSIONING OF CLEAR WATER UNDERGROUND RESERVOIR OF 3 MG CAPACITY, TOGETHER WITH PUMP HOUSE ON UGR, SUBSTATION BUILDING INCLUDING SUPPLY AND INSTALLATION OF RELATED ELECTRO-MECHANICAL WORKS OVER PILE FOUNDATION ALONG WITH TRIAL RUN FOR 3 MONTHS AND SUBSEQUENT OPERATION & MAINTENANCE FOR 12 MONTHS ADJACENT TO TANK NO. 5, AF BLOCK UNDER BIDHANNAGAR MUNICIPAL CORPORATION ARE ON TURNKEY BASIS UNDER AMRUT.

SRIRAMPUR RAW WATER INTAKE JETTY

Design, Construction, Strengthening, Augmentation and Commissioning of R.C.C. Intake Jetty with Pump House mounted on the Jetty Head along with Sub-station building all Civil and Electro-Mechanical works complete, by side of River Ganga and supplying and laying of 500 mm dia M.S. Raw Water Rising Main from existing Raw Water Intake Jetty location of Howrah Water Works located at Srirampur to 5 Mtr. from the Inlet Sump of the proposed W.T.P. with trial run for 3 months and Operation and Maintenance for a period of 12 months after commissioning of the Project on Turnkey basis under State Fund

BHADRESWAR WATER INTAKE JETTY

Design, Construction and Commissioning of R.C.C. Intake Jetty with Pump House mounted on the jetty along with sub-station building (incorporated in jetty complex) all Civil and Electro-Mechanical works complete, by the side of river Ganga under Bhadreswar Municipality in ward no. 16 and laying of 600 mm dia D.I. (K9) raw water rising main from raw water Intake Jetty to Bhadreswar Water Treatment Plant and Operation and Maintenance for a period of 12 months after commissioning of the project under Bhadreswar Municipality on turnkey basis under JnNURM.